Your browser does not support script
Investors
Show printable version of 'Thunder Ridge' item in a New Window
Email 'Thunder Ridge' item to a friend


Thunder Ridge

PROJECT HIGHLIGHTS

property map
  • 45.59 g/t gold over 2.5 metres including 223 g/t gold over 0.5 metres in hole SC-005
  • Owned 100% by Spanish Mountain Gold
  • Excellent road access and grid power within 20km

SUMMARY

Spanish Mountain Gold acquired this property in 2006 based on its Sediment Hosted Gold possibility along trend to the flagship property Spanish Mountain. After the discovery of the Thunder Ridge Zone, the Company's focus on the property evolved to a high grade target that continues to develop. The property is located approximately 50 kilometres northeast of the town of 100 Mile House in central British Columbia. The Thunder Ridge zone is accessed via a network of well maintained Forest Service roads directly from 100 Mile House.
top

map

GEOLOGY OVERVIEW

The property is underlain by a sequence of Triassic black phyllite similar to the rocks underlying the main zone at the Spanish Mountain property. Gold mineralization is associated with quartz veining and flooding within a northeast trending structure.


THUNDER RIDGE DRILL RESULTS TO DATE

Table 1

Hole

 

From (m)

To (m)

Width*

Au (g/t)

SC019

 

62.00

63.50

1.50

19.30

SC019

And

106.50

128.50

22.00

0.34

SC019

Including

116.00

121.00

5.00

0.55

SC019

and including

120.00

121.00

1.00

1.12

SC019

And

191.50

212.90

21.40

0.67

SC019

Including

197.00

205.50

8.50

1.05

SC019

and including

208.60

211.50

2.90

1.13

SC019

and including

197.00

211.50

14.50

0.87

SC020

 

18.50

20.00

1.50

0.51

SC021

 

49.50

51.00

1.50

0.50

SC021

And

138.00

139.55

1.55

0.58

SC021

And

176.75

191.50

14.75

1.42

SC021

Including

176.75

180.55

3.80

4.54

SC021

And

239.88

279.00

39.12

0.30

SC021

Including

239.88

245.00

5.12

0.67

SC021

and including

253.90

255.00

1.10

0.85

SC022

 

204.00

225.50

21.50

0.61

SC022

Including

210.00

214.50

4.50

1.47

SC022

and including

221.00

224.00

3.00

1.37

SC022

And

296.00

297.50

1.50

0.60

SC023

 

250.00

288.30

38.30

0.80

SC023

Including

250.00

276.00

26.00

1.03

SC023

and including

253.00

254.50

1.50

1.16

SC023

and including

264.03

265.50

1.47

3.54

SC023

and including

268.50

274.30

5.80

2.29

SC023

and including

268.50

270.00

1.50

5.33

SC023

And

286.00

287.00

1.00

1.51

SC024

 

187.00

188.50

1.50

0.51


* core length - does not represent true width

Drill Hole From To Length (m) Gold (g/t) Silver (g/t)
10-SC-025 183.0 189.6 6.6 0.77 2.74
           
10-SC-026 42.0 48.5 6.5 0.45 1.84
10-SC-026 58.0 61.5 3.5 0.69 2.56
           
10SC027 23.2 24.1 0.9 2.06 4.50
10SC027 40.0 43.3 3.3 0.63 2.30
10SC027 221.0 241.0 20.0 0.77 19.76
includes 239.0 240.0 1.0 1.97 100.00
           
10SC028 no significant intercepts
           
10SC029 39.8 41.5 1.7 3.74 19.80
10SC029 71.0 76.0 5.0 1.11 1.99
includes 74.6 76.0 1.5 3.45 2.50
           
10SC030 50.5 58.1 7.6 0.57 1.89
includes 52.0 53.0 1.0 2.05 2.50
           
10SC031 43.0 97.0 54.0 0.77 4.54
includes 44.0 45.0 1.0 19.15 83.80
includes 47.5 49.7 2.2 2.2 19.48
includes 82.7 86.0 3.3 1.99 3.24


top
 
view map
click to view enlarged
Thunder Ridge Drill Hole Locations
Thunder Ridge Drill Hole Locations
click to view enlarged